Taiban Mesa Switching Station and Wind Farm Article

This is article in T&D World Magazine  about a 345kV switching station that we performed the testing and commissioning on for Public Service of New Mexico and General Electric.  The protection was primarily Multilin with an integrated Trip Security System that when enabled required two of three relays to recognize a fault before tripping to minimize nuisance operations.

Related Links

Taiban Mesa 21st Century Control House

Similar article in T&D World Magazine regarding the control house.  AtlasPower also performed end-to-end relay testing utilizing GPS for the D60’s and L90 relays.

Metcalf Substation Bank 13 Addition Article

This is another article in T&D World Magazine about this major transformer addition in the Bay area for Pacific Gas and Electric.  AtlasPower performed the testing and checkout for Black & Veatch.

SRP RUDD Substation Article

This is a news release from the APS web site about this 500/230kV substation where AtlasPower performed the electrical testing for General Electric and Salt River Project.

Klamath Falls Power Plant Article

This is an article from the PPM Energy web site about this power plant where AtlasPower performed the electrical testing, startup and commissioning for Black & Veatch.

Joffre, Alberta Co-Generation Facility Article

This article is at Power-Technology.com and talks about this power plant in Canada.  AtlasPower performed the electrical testing, startup and commissioning.